Replacing and Upgrading Electrical Distribution Services

An engineering study of the 46-year-old electrical main distribution system for the campus was completed. This system feeds electrical systems on campus. The existing electrical switchgear will require replacement to allow future growth of new facilities on campus including the new Canada Games Residence.

A plan to replace and relocate the main electrical switchgear will allow the existing system to be operational while the new switchgear is installed and to allow it to be installed to meet current electrical code requirements.

Budget
$1,500,000
Contractor
Hansen Electric
Listing
Complete
Location
秀色短视频 Campus
Status
Complete
Consultant
Richardson Associates (1993) Ltd.